Indiana University Management Essay

Description

Identify an easy to understand 5-10 step process that you are familiar with.  This could 

be a process at work or outside of work.  An example of an outside process could be
the airline check-in to boarding process, or an in person visit to the bureau of motor
vehicles for license renewal. Select a process that can be completed in one day.  Do
not select a process that stretches across weeks or months where the majority of the
process time is spent in waiting.  The introduction should include the background
information on your process including the name of the process and a brief description
of the steps and process flow.  A flow diagram or swim lane is extremely helpful in
identify the flow of the process.  (If provided, the diagram should not take the place of
overall discussion).  The introduction should also include your thesis/problem
statement and the discussion points that you plan to develop in the body of the report.  
Remember the thesis should identify the problem that you are trying to solve and the
discussion will be specific to the steps utilized by the theory of constraints.
Discussion should include the following:
? Find the Constraint: Which step in the simple process is the biggest
constraint? Describe your observations on how you came to this conclusion
and what makes this step the constraint. You can share personal experiences
here. Where possible try to be factual. For example, there may be a long line at
an airline for check in but the line moves relatively quickly, roughly less than 5
minutes from the time you arrived to the time you got your ticket. Versus, a 

Homework 5: TECH 50801 Quality and Productivity in Industry and Technology
short line at TSA security check but the line moves very slowly, roughly 15
minutes from the time you arrived at the TSA check-in to the time you passed
TSA inspection.  Please note in the above example those times are
approximate.
? Exploit the Constraint: For the step that you’ve identified as the constraint,
identify quick improvements to the throughput of the constraint using existing
resources for that step in the process. Again, you can share all personal
experiences and where possible try to be factual.
? Subordinate everything else to the constraint: Review all other activities in
the process to ensure that they are aligned with and truly support the needs of
the constraint. What modifications would you make to upstream resources or
steps in the process to make the constraint more efficient?
? Elevate the Constraint: If the constraint still exists (even if there is
improvement but the constraint remains the weakest link in the process) what
further action can be taken to eliminate it from being the constraint.  
There will always be a constraint, the bottleneck or the weakest link.  The purpose is
to identify the constraint, walk through the steps to eliminate the current constraint,
and once it is removed, another step becomes the new bottleneck or constraint to focus
on.  This is part of the continuous improvement cycle.  One step, one piece of
equipment or one part of the workforce will always be the constraint that keeps the
process from being more efficient.  

One of the sources given to us: 

https://www.leanproduction.com/theory-of-constrain…

Unformatted Attachment Preview

Homework 5: TECH 50801 Quality and Productivity in Industry and Technology
QUALITY CULTURE – DETERMINING THE CRITICAL VALUES
ABSTRACT
The Theory of Constraints is a process improvement methodology that emphasizes
the importance of identifying the “system constraint” or bottleneck. By leveraging this
constraint, organizations can achieve their financial goals while delivering on-time-infull (OTIF) to customers. Other common benefits of implementing the Theory
of Constraints include better control over operations, less inventory, reduced conflicts
between team member and drastically reduced firefighting. Often, additional capacity
gets exposed without further capital investment or hiring additional workers.
The Core Idea – Every system has a limiting factor or constraint. Focusing
improvement efforts to better utilize this constraint is normally the fastest and most
effective way to improve profitability. https://www.tocinstitute.org/theory-ofconstraints.html
INFORMATION SOURCE
Lean Production – Theory of Constraints: https://www.leanproduction.com/theoryof-constraints/
Notes from “The Goal” – Theory of Constraints “TOC Summary pdf “ under
module resources
ASSIGNMENT
Identify an easy to understand 5-10 step process that you are familiar with. This could
be a process at work or outside of work. An example of an outside process could be
the airline check-in to boarding process, or an in person visit to the bureau of motor
vehicles for license renewal. Select a process that can be completed in one day. Do
not select a process that stretches across weeks or months where the majority of the
process time is spent in waiting. The introduction should include the background
information on your process including the name of the process and a brief description
of the steps and process flow. A flow diagram or swim lane is extremely helpful in
identify the flow of the process. (If provided, the diagram should not take the place of
overall discussion). The introduction should also include your thesis/problem
statement and the discussion points that you plan to develop in the body of the report.
Remember the thesis should identify the problem that you are trying to solve and the
discussion will be specific to the steps utilized by the theory of constraints.
Discussion should include the following:
•
Find the Constraint: Which step in the simple process is the biggest
constraint? Describe your observations on how you came to this conclusion
and what makes this step the constraint. You can share personal experiences
here. Where possible try to be factual. For example, there may be a long line at
an airline for check in but the line moves relatively quickly, roughly less than 5
minutes from the time you arrived to the time you got your ticket. Versus, a
Homework 5: TECH 50801 Quality and Productivity in Industry and Technology
short line at TSA security check but the line moves very slowly, roughly 15
minutes from the time you arrived at the TSA check-in to the time you passed
TSA inspection. Please note in the above example those times are
approximate.
•
Exploit the Constraint: For the step that you’ve identified as the constraint,
identify quick improvements to the throughput of the constraint using existing
resources for that step in the process. Again, you can share all personal
experiences and where possible try to be factual.
•
Subordinate everything else to the constraint: Review all other activities in
the process to ensure that they are aligned with and truly support the needs of
the constraint. What modifications would you make to upstream resources or
steps in the process to make the constraint more efficient?
• Elevate the Constraint: If the constraint still exists (even if there is
improvement but the constraint remains the weakest link in the process) what
further action can be taken to eliminate it from being the constraint.
There will always be a constraint, the bottleneck or the weakest link. The purpose is
to identify the constraint, walk through the steps to eliminate the current constraint,
and once it is removed, another step becomes the new bottleneck or constraint to focus
on. This is part of the continuous improvement cycle. One step, one piece of
equipment or one part of the workforce will always be the constraint that keeps the
process from being more efficient.
SUBMISSION REQUIREMENTS
•
•
•
•
•
Word File
Double Spaced, Times New Roman Font, 12 point
Minimum 4 pages of discussion (supporting graphics and tables are
welcomed, but they should be in addition to the required discussion length)
Include a Separate Title Page: Times New Roman Font, 14 Point. Centered:
Assignment #, Course Name and Number, Due Date, Your Name
Reference Page (minimum 4 references)
***Look at the Grading Rubric and make sure all items are included. If you do not
include and item or a required section, then you lose all points for that section***
Notes from “The Goal” – Theory of Constraints
A View of the Whole – Theory of Constraints (ToC)
• Looks at a system as a whole – not individual parts
• Every system has a goal
• Systems are like chains . . . the performance of a system is limited by the
weak link (constraint)
• The system optimum is NOT the sum of the optimized parts
• If you look at a race car team, does having the best driver ensure that every race will
be won? How about the best driver and the best pit crew? Would having the best
car ensure success?
NOTE: For simplicity purposes often times lean practitioners use the phrase
“bottle neck” and constraint interchangeably.
Theory of Constraints – 5 Focusing Steps
1. Find the constraint
Symptoms to look for — resource is heavily stressed, work in progress piles up in front of the
resource, and resources downstream from constraint are regularly idle.
2. Exploit the constraint
The output of the system equals the output of the constraint. Therefore, get as much useful work out
of the constraint as possible. Remove any non-productive work, ensure that there is always
something to work upon, so that the bottleneck is never idle, but don’t overload the bottleneck with
too much work in progress: let the bottleneck “pull” work, and carefully prioritize the work of the
bottleneck.
3. Subordinate everything else to the constraint
Those resources that are not bottlenecks have (by definition) some extra capacity. Use that capacity to
help the bottleneck where possible, resources are already paid for. This might mean slowing other
resources down.
4. Elevate the constraint
Invest resources and time to improve the performance of the bottleneck.
5. Do not let inertia become the constraint
There’s always a bottleneck. There’s always a way to improve further.
Recall this Value Stream Map illustration from Week 5. The lower row of metrics from the various steps provides the
average “touch labor” (processing time) per airplane and the upper row provides the average “wait times” between
process steps (work stations.)
ValuerowStream
Map
1) PAPR-Co
Look at the ‘bottom’
of numbers,
which work station has the highest processing time?
2) Look at the ‘top’ row of numbers, between which two steps has the longest wait times? These would be significant
constraints to the production flow!
Pooches – Work Request
tracking system
Customer
POOCHES
0 Sec
Order
Processor
X1
Supply
Folder 1
Folder 2
Inspector
Shipping
X1
X1
X1
X1
X1
Work Stations
Performance Measures
10 Sec
2 Secs
28 Sec
6 Secs
49 Sec
8 Secs
4 Sec
40 Secs
Top numbers: Wait times
4 Secs
6 Secs
42 Secs
Bottom numbers: Processing times
Theory of Constraints – 5 Focusing Steps
1. Find the constraint
• Is Folder 2’s inbox overflowing?
2. Exploit the constraint
• Is everything Folder 2 does productive?
3. Subordinate everything else to the constraint
• Can you reduce the flow of planes to Folder 2? Or
• Can you increase the output rate of Folder 2?
• (Hint: Are the “Order Processor” or “Supply” employees idle?
Can they multi-task and take on some “Folder 2” workload?
4. Elevate the constraint
• Can we make any investments into this process?
• Training?
• Equipment?
5. Do not let inertia become the constraint
• Find the next bottleneck and repeat!

Purchase answer to see full
attachment
Explanation & Answer:

4 pages

User generated content is uploaded by users for the purposes of learning and should be used following Studypool’s honor code & terms of service.

Get 20% Discount on This Paper
Pages (550 words)
Approximate price: -

Try it now!

Get 20% Discount on This Paper

We'll send you the first draft for approval by at
Total price:
$0.00

How it works?

Follow these simple steps to get your paper done

Place your order

Fill in the order form and provide all details of your assignment.

Proceed with the payment

Choose the payment system that suits you most.

Receive the final file

Once your paper is ready, we will email it to you.

Our Services

Ace Writing Center has stood as the world’s leading custom essay writing services providers. Once you enter all the details in the order form under the place order button, the rest is up to us.

Essays

Essay Writing Services

At Ace Writing Center, Nowadays, students normally have extremely busy schedules. You will note that some of them have to take on some evening or weekend jobs in order to get some income that can help them to sustain in college or in the university. This can deny them a chance to write all the essays given. Others usually get bombarded with a lot of work by their lecturers. This can still delay such students from working on all their essays. However, some of them usually try to work on all these essays but end up delivering their work late. This can prevent them from graduating since most lecturers are strict on deadlines. If you want to write a business essay, the wise way is to hire an outstanding essay writing service like us, so that you can get the best results. If you are keen, you will note that many companies usually overcharge their customers. Some of them are there only to make money. And in reality, they really don’t care to build a long term commitment with students. You should not choose such companies. You should take your time and choose a reliable company to work with. Ace Writing Center is the ultimate solution for you. We have been offering our writing service for more than 7 years. This is a clear indication that you will get quality essay writing service. We have a wide range of writers who can work on any business essay that you might have. We believe in doing extensive research so that we can provide quality work to all our clients. .

Admissions

Admission and Business Papers

Have you ever had to write an admission essay for college? The majority of students face the same issues when applying to a university or college and many in such situations decide they need professional help to cope with this matter. They get in a situation when the deadline keeps coming closer but lack motivation to start because they are just not sure if their writing skills are strong enough. We have a solution for you! Ace Writing Center is the best admission essay writing service with a large professional team and years of experience in providing high-quality papers to students of all levels and faculties. The mission of our team is to help students make their dreams of entering a good college come true and that’s what we offer!.

Editing

Editing and Proofreading

Sometimes all the words for your paper just flow out of your mind and into your fingers. You type quickly at your keyboard and there they are, your beautiful words right there on the screen. But you have no idea how to polish it up. You may be wishing there was a paper writing service that offered this type of writing service. Look no more! Here at Ace Writing Center, we offer you an editing and proofreading option that you can't find anywhere else..

Coursework

College Essay Writing

In case you are familiar Ace Writing Center, you know the way to distinguish a better company from a cheap one exactly. First of all, poor service website does not have a sufficient support. We think support team is an essential part of success; it has to answer all clients’ questions and be a connecting link between clients and their writers. On our web-service you will get answers about anything you need and your writer will receive all your instructions, assignments and requirements exactly and swiftly. A writing service that we run has got a flexible pricing system that will save you from senseless wastes and many bonus systems that let you sparing money for something important for you.